Projects

  • Pierre-Papin building
  • Pierre-Papin building
  • Pierre-Papin building
  • Pierre-Papin building

Existing office building which required major renovations of the ventilation and air conditioning systems. We were awarded the first tender in 2012 for the renovation of the upper floors (Phase I). We were then awarded the second tender in 2013 for the renovations of the lower floors (Phase II). The two phases were executed in stages to give our client the chance to move the building occupants. We performed the work directly for the city of Gatineau as a general contractor.

Heating
Ventilation
Plumbing

The main components of the project’s mechanical systems are :

  • Replacement of 119 Trane fancoils systems in the ceilings throughout the building on six floors;
  • Modifications to the chilled water system;
  • Modifications to existing refrigeration circuits of direct expansion chillers on the roof;
  • Retrofit with KMC controls system.

We provided the following services :

  • Plumbing;
  • Ventilation;
  • Chilled water piping;
  • Building controls (subcontracted);
  • Thermal insulation (subcontracted);
  • Electrical work (subcontracted).
  • General work such as ceiling, drywall repairs and patching (subcontracted);

Privacy policy

By agreeing to share certain navigation information with us, you are helping us to improve and offer you an optimal browsing experience. Thank you for your support! Privacy policy

Activate the categories you want to share, thanks for your help! Privacy policy

  • None for the moment
  • None for the moment
  • None for the moment