The project involved the replacement of both cooling towers as well as the roof in the cooling tower mechanical roof. The replacement of the chilled water pumps and condenser water pumps as well as modifying the necessary piping in order to optimize the system was included in the scope of work. The work had to be accomplished with minimal disruption to the building occupants and courthouses in the building. The project was carried out in several phases and the schedule had to be specific to seasonal changes.