Projects

  • Water Treatment Plant in Buckingham
  • Water Treatment Plant in Buckingham
  • Water Treatment Plant in Buckingham
  • Water Treatment Plant in Buckingham
  • Water Treatment Plant in Buckingham
  • Water Treatment Plant in Buckingham
  • Water Treatment Plant in Buckingham

Additions and extensive renovations were made to the existing building to increase drinking water production capacity of the Buckingham and Masson-Angers sectors. The work was carried out over 2 years.

Heating
Ventilation
Plumbing

The main components of the project’s mechanical systems are :

  • Rooftop air-conditioning units from York for the offices;
  • Ventilation systems for production areas and equipment rooms manufactured by Bousquet Technologies;
  • Custom PVC ventilation ductwork for the evacuation of the water basins and Greenheck epoxy coated roof exhaust ventilators;
  • Chimney for the diesel engine exhaust of a backup water supply pump and the power generator supplied and installed by Cheminee Lining;
  • Complete drainage network;
  • Domestic water supply network;
  • Compressed air piping and 2 new 7.5 HP compressors manufactured by Ingersoll Rand.

We provided the following services :

  • Plumbing;
  • Ventilation;
  • Heating and cooling;
  • Thermal insulation (subcontracted).

Privacy policy

By agreeing to share certain navigation information with us, you are helping us to improve and offer you an optimal browsing experience. Thank you for your support! Privacy policy

Activate the categories you want to share, thanks for your help! Privacy policy

  • None for the moment
  • None for the moment
  • None for the moment