Projects

  • L'Orée des Bois school
  • L'Orée des Bois school
  • L'Orée des Bois school
  • L'Orée des Bois school

This new elementary school was built in Cantley which includes two floors. Three kindergarten classrooms, library, administration, specialized service room and technical facilities in addition to the gymnasium are located on the ground floor. Sixteen classrooms are located on the second floor.

Heating
Ventilation
Plumbing

The main components of the project’s mechanical systems are :

  • York Solution Ventilation systems for the gymnasium and classrooms from Johnson Controls;
  • Indoor and rooftop heat recovery units manufactured by Venmar;
  • Geothermal System composed of 30 wells including the drilling and exterior piping;
  • Water Furnace heat pumps for the administration and surrounding area;
  • Hot water heating and terminal reheat in the ventilation;
  • Mechanical room consisting of geothermal heat pumps and electric auxiliary boilers from Caloritech;
  • Ultraviolet water treatment system for the deep well domestic water system.

We provided the following services :

  • Plumbing;
  • Ventilation works;
  • Heating and cooling;
  • Drilling of geothermal wells (subcontracted);
  • Building controls (subcontracted);
  • Thermal insulation (subcontracted).

Privacy policy

By agreeing to share certain navigation information with us, you are helping us to improve and offer you an optimal browsing experience. Thank you for your support! Privacy policy

Activate the categories you want to share, thanks for your help! Privacy policy

  • None for the moment
  • None for the moment
  • None for the moment