As part of this project, we have replaced two large rooftop units that provide air conditioning and heating to the 5 floors of the office building. The existing 75 and 105 tons units were installed by us in 1990 in the original construction of the building. The challenge was to make the replacement of both units in the shortest time possible with the least possible discomfort for the building occupants as all office space was fully occupied. Strict planning permitted the work to be carried out in one weekend starting Friday and performing the unit start-up on the Sunday. This work was also carried out in parallel with the roofing contractor and the electrician who worked for directly for the building owner. Both air handling units were successfully replaced within the allowed timeframe.

Heating
Ventilation
Plumbing

The main components of the project’s mechanical systems are :

  • Two large Trane packaged rooftop units, 90 and 105 tons each with return fans;
  • Two exterior gas humidifiers installed on the roof;
  • Crane services;
  • The removal and transport of old units;
  • Transport coordination for the new units;
  • The design and production of ventilation ductwork installed on the roof.

We provided the following services :

  • Ventilation;
  • Natural gas;
  • Plumbing;
  • Thermal insulation (subcontracted).

Privacy policy

By agreeing to share certain navigation information with us, you are helping us to improve and offer you an optimal browsing experience. Thank you for your support! Privacy policy

Activate the categories you want to share, thanks for your help! Privacy policy

  • None for the moment
  • None for the moment
  • None for the moment