This project aimed to replace a roof cooling tower for Public Works Canada on a 17-storey building. The replacement work was carried out during a weekend since the use of a 550-ton crane required the closure of a city street for more than 24 hours. We performed the contract as a general contractor.

Heating
Ventilation
Plumbing

The main components of the project’s mechanical systems are :

  • Removal of the asbestos panels in the old cooling tower;
  • The disconnection of the piping;
  • The removal and transportation of the old cooling tower;
  • Modifying structural component to receive the new cooling tower;
  • Installation and commissioning of the new cooling tower manufactured by Cool Water Technology;
  • The piping connections to the new cooling tower;
  • Permits and signaling;
  • The coordination and the transport of equipment;

We provided the following services :

  • Stainless steel piping work;
  • Structural work;
  • Electrical work (subcontracted)
  • Asbestos removal (subcontracted);

Privacy policy

By agreeing to share certain navigation information with us, you are helping us to improve and offer you an optimal browsing experience. Thank you for your support! Privacy policy

Activate the categories you want to share, thanks for your help! Privacy policy

  • None for the moment
  • None for the moment
  • None for the moment